Saturday
We pulled in around noon in two vehicles; Lyssa’s on call at the hospital this weekend and may need to go in on short notice. Jake and Hannah rode in the truck with me, Josh kept Lyssa company in the car. The boys finished eating their Culver’s and were quickly off playing with their trucks and tools in the sawdust pile “quarry”. Lyssa unpacked our stuff in the keep while I set out to put the finishing touches on the Outhouse Relocation Initiative.
First, I wanted to address the old outhouse location. I certainly didn’t need Hannah messing around in there. I grabbed the green ATV and small yard trailer to collect all the bricks around the pit. Then I dug around the outside of the buried metal retaining ring and piled the dirt in the middle. Once I was about four inches below ground level all around the ring, I got out my sawzall and sliced the ring as far down as I could reach. I levelled out the dirt as best I could and with that the site was retired. I’ll need to fill in with more dirt later to even out the area, but it looks much better than it did.