Made it up around 2:00 pm for a quick supply run. There was a big TV sale at Best Buy earlier this month—$200 for a 50″ 1080p LCD. The keep gets a nice upgrade, and the 42″, 720p LCD that’s being replaced will move to the pole barn. I also brought Lyssa’s snow tires back and a few other odds and ends.
I set up the TV and configured the Harmony remote hub and the receiver to work with it. With that out of the way, I closed up the keep and moved on to the pole barn. I stacked Lyssa’s tires and put the old keep TV on the workbench for now. I really need to spend some time organizing this building again.
Before heading out, I had one more thing to try. Last fall at deer camp, we wrecked my pump fill tube trying to thaw it out. So I used the opportunity to build it better. The new one has a much larger “priming tank” made from a section of 4″ PVC. The drain has been improved, too. Instead of the old drilled-hole-plugged-by-a-big-bolt, there’s now a 3/4″ PVC tee below the fill tube that terminates in a 45° elbow with a removable plug.
With my checklist complete for the day, I was on my way out around 4:30.
Leave a Reply
You must be logged in to post a comment.